Balanced Console

Balanced Cantilever - Cast in Situ / Ankara - Sivas YHT Viaducts / Kırıkkale

ANKARA-SIVAS HIGH SPEED TRAIN VIADUCTS / BALANCED CANTILEVER / CAST IN SITU /  PT / KIRIKKALE

Description of the Work:
Construction of V2 and V5 using cast-in-situ method and V4 Viaduct using balanced cantilever method in
the scope of Ankara-Sivas Railway Project Section II.

Freysaş Mission:
Post-tensioning works of the deck. Construction of the deck using balanced cantilever and cast-in-situ
methods.