Bridges

Balanced Cantilever / Derevenk Viaduct / Kayseri

DEREVENK VIADUCT / BALANCED CANTILEVER / PT / KAYSERİ

Description of the Work:

Construction of Şehzadeler Viaduct using balanced cantilever method in the scope of Kayseri South Ring
Road Connection Project.

Freysaş Mission:
Post-tensioning works of the deck. Construction of the deck using balanced cantilever method and casting
curve analysis. Supply of formtraveler.