Bridges

Cast In Situ / PT / Çömü Bridge / Çanakkale

18 MARCH UNI. BRIDGE / CAST-IN-SITU / PT / ÇANAKKALE

Description of the Work:
Construction of ÇOMÜ Piri Reis Bridge using cast-in-situ method in the scope of Çanakkale-Ezine-Ayvacık
Road and Havran-Edremit-Ayvacık Road Project.

Freysaş Mission:
Supply of PT materials and isolators. Post-tensioning works of the deck. Construction of the deck using
cast-in-situ method.