Bridges

Cast In Situ / PT / Hacı Emin Viaducts / Gümüşhane

HACIEMIN 1-2 VIADUCTS / CAST-IN-SITU / PT / GÜMÜŞHANE

Description of the Work:
Construction of 2 units of cast-in-situ PT bridges in the scope of Gümüşhane Belt Highway Project.

Freysaş Mission:
Supply of PT materials. Post-tensioning works of the deck. Construction of the deck using cast-in-situ
method.