Extradosed / 15 Tem. Dem. Şehitleri Bridge / Antalya
15 TEMMUZ DEMOKRASİ ŞEHİTLERİ BRIDGE / EXTRADOSED /ANTALYA
Description of the Work:
Çallı Bridge having 6 pylons, 2 spans of 50 meters and a main span 80 meters, is the first bridge built
using Extradosed construction method in Turkey. Bridge’s deck and pylons are made of cast-in-situ
post-tensioned concrete. During the construction of Çallı Bridge, 70 tons of Freyssinet Cohestrand and
205 tons of PT Strand have been used, where besides the bridge bearings and expansion joints were
also supplied and installed.
Freysaş Mission:
Design of the PI Section Extradosed Bridge, Stay Cable and Post-Tensioning material supply, PT works and
Extradosed works are accomplished by Freysaş.