ALIBEYKÖY METRO CROSSING BRIDGE / CAST-IN-SITU / PT
Description of the Work:
Construction works of 2 units cast-in-situ PT bridges in the scope of Mecidiyeköy-Mahmutbey Subway
Line Project.
Freysaş Mission:
Supply of PT materials. Post-tensioning works of the deck. Construction of the deck using cast-in-situ
method. Supply and installation of bearings and isolators.