Yerinde Döküm

Cast In Situ / PT / Mevlana Bridge / Antalya

MEVLANA BRIDGE / CAST-IN-SITU / PT / ANTALYA

Description of the Work Ardgerme:
Construction of 1 unit of cast-in-situ PT bridge in the scope of Mevlana Tunnel Crossing Junction Project.

Freysaş Mission:
Supply of PT materials. Post-tensioning works of the deck. Construction of the deck using cast-in-situ
method.